F05 Smart GPS Tracker – Real-Time Location Device for Car, Pet, Kids, Bike, and Valuables
Détails du produit
F05-compatible-Apple-Find-My
- Works with
- Apple Find My
- Apple FindMy Anti-Lost
- Place your card in a small space such as your wallet or badge to locate and find your items.
F05-Global Search
- Global Find
- Works with
Apple Find My
No need to download APP" - Multiple devices available
- One-touch call anti-lost and anti-lost
- beep beep beep
- Authentication chip lower power consumption
- "Hey, Siri.
Help me find the key"
F05-Global precise positioning
- Upgrade black technology
- Global precision positioning
- Relying on the FINDMY network, as long as there are Apple devices
(IPHONE/IPAD/MAC) around the world, you can find the location, and
your privacy is always protected during the whole process" - Unlimited distance, global precision pursuit
F05-Accurate family positioning
- Precise family location
- Let you feel more at ease
- Accurate positioning, one key can find scattered Children and the elderly, safe and secure
F05-Apple certified
- Certified by Apple
- Global precision positioning
- Relying on the FlNDMY network, as long as there are Apple devices (iPhone/ipad/mac) around the world, you can find the location, and your privacy is always protected during the whole process
- "Works with Apple Find My"
F05-P67Dustproof and waterproof
- P67 dustproof and waterproof
- Easy to deal
- No fear of water spray flying dust, easy to deal with the daily water spray flying test
F05-P67Find Items
- Find items to prevent loss
- Listen to the sound to distinguish the position
- Open the "find" APP provided by IPHONE or IPAD, click to play the sound, and the device will sound to remind you to find items quickly.
- Didi
F05-Applicable Scenarios
- Farewell to the trouble of finding things
- Meet the peace of mind of life
- SAY GOODBYE TO THE TROUBLE OF FINDING THINGS AND WELCOME A PEACEFUL LIFE
- /no longer worry about lost items/
- /bag items lost/
- /backpack pendant/
- /Elder out/
- /Anti-lost Pet/
F05-Product Information
- "Product Name
Apple FindMy Anti-Lost" - "Inductive mode
Bluetooth" - "Power supply mode
Lithium battery 170mAh" - "Standby duration
About 6 months" - Material technology:ABS acrylic mirror
- Product size:85*54*3.28mm
- Weight only 15.4g
- Alarm Duration:10 seconds
- Installation method:Handmade
- "Product color
Currently only black (other colors need to be customized in advance)
" - "Product Features
Only applicable to Apple IOS system;
Wireless charging, repeated use and long-lasting use ofa wide range ofscenarios" - "Product Description
This product is officially authorized by Apple, using Apple Findmy technology, to borrow Apple IOS system ecology, deep through, connect various Apple devices, applications Find in ltems"
F05-Purchase Instructions
Purchase Instructions
1.Is there a distance limit?
No distance limit,globally available.As long as there are Apple devices within10-50 meters nearby.Because it can't locate itself is relying on nearby Apple devices to locate.
2. ls it real time?
Apple devices nearby will be located in real time,if not,non-real-time positioning.
3.Working principle
It will send out a secure Bluetooth signal every two seconds,allowing nearby Apple devices(mobile phones,computers,tablets,etc.)to detect and receive it,and upload it to the Apple iCloud cloud serverto generate a location,and then see it on the map.Precise location.So the more nearby Apple devices,the faster the location updates.
"4.Apple's dedicated version is only applicable to Apple's mobile phone.
Apple/Android Universal supports Android and Apple phones"
5.Use area and scope
Basically in the city bustling place or apple device more places.Remote areas or places with fewer Apple devices are not suitable.Please consider whether it is appropriate to buy again.
6.Use Scenarios
Pets,the elderly,children lost,valuables,luggage,wallets,bicycles,electric vehicles to find,express lost,car positioning,etc.
Why is the location inaccurate and notupdated?There may be no Apple devices nearby.
Service client
Contactez-nous pour toute question sur les produits et les commandes.
Garantie
- Les produits bénéficient d’une garantie d’un an à compter de la date d’achat.
- Elle couvre les défauts de fabrication dans des conditions normales d’utilisation. Les dommages liés à une mauvaise utilisation, un accident, l’usure normale ou une modification non autorisée sont exclus.
- Pour une demande de garantie, contactez-nous avec votre numéro de commande et des photos.



